It's already friday... and i'm getting anxious on my credit card approval....
Still haven't heard anything from them yet...aren't they suppose to be fast/ efficient..? hm...
Lots of drawings to be submitted.. lots of VO to be submitted & discussed..
How can i have fun with all these things that haven't been settled out...
I'm already loosing sleep over these...
I skipped lunch the other day... coz, ck was busy with inspection & me with other things to do...
Then, i ate KFC at nite... wow... i had a major case of diarrhea... i guess it's gastric too... kept me up till over 3 am.... then the next day... my stomach ache like hell.. i felt like vomitting too... i did managed to stuff in a few mouthfull of ' wan tan mien' while lunching with ck...
I was thinking of taking MC, but i'm even scared of driving back... so i just stayed in site office & draw up some sectional view for thermostat position, grooveline position & LMR elevation view... felt ok after going to the loo....
Tired though...ck was a little frustrated by me.. coz i didn't tell him that the groove line was supposed to be position/ measured from the ceiling to below...
I saw that he had drawn the dimension from the Floor up... i never thought that it's not the same... tecnically, it's should be the same.. but the site condition is different from what we draw up i.e: slab thickness.. so there's an offset of 80mm.... argh...~~